All Issue

2025 Vol.32, Issue 2 Preview Page

Research Article

30 April 2025. pp. 168-178
Abstract
References
1

Bayliss, S., & Bergin, R. (2020). The modular housing handbook. Routledge.

10.4324/9781003106296
2

Bello, A. O., Khan, A. A., Idris, A., & Awwal, H. M. (2024). Barriers to modular construction systems implementation in developing countries' architecture, engineering and construction industry. Engineering Construction and Architectural Management, 31(8), 3148-3164. https://doi.org/10.1108/ecam-10-2022-1001

10.1108/ECAM-10-2022-1001
3

Bhatia, A. P. S., Han, S., & Moselhi, O. (2022). A simulation-based statistical method for planning modular construction manufacturing. Journal of Information Technology in Construction, 27, 130-144. https://doi.org/10.36680/j.itcon.2022.007

10.36680/j.itcon.2022.007
4

Cabral, M. R., & Blanchet, P. (2023). Analytical hierarchical process as a multicriteria decision tool in material selection for prefabricated wood buildings. Buildings, 13(12), Article 2973. https://doi.org/10.3390/buildings13122973

10.3390/buildings13122973
5

Elnaas, E. 2014. The Decision to Use Off-Site Manufacturing (OSM) Systems for House Building Projects in the UK. University of Brighton.

6

Filion, M. L., Ménard, S., Carbone, C., & Bader Eddin, M. (2024). Design analysis of mass timber and volumetric modular strategies as counterproposals for an existing reinforced concrete hotel. Buildings, 14(4), 1151.

10.3390/buildings14041151
7

Gibb, A., & Isack, F. (2003). Re-engineering through pre-assembly: client expectations and drivers. Building Research & Information, 31, 146-160.

10.1080/09613210302000
8

Gledson, B. (2022). Enhanced model of the innovation-decision process, for modular-technological-process innovations in construction. Construction Innovation-England, 22(4), 1085-1103. https://doi.org/10.1108/ci-02-2021-0021

10.1108/CI-02-2021-0021
9

Hough, M. J., & Lawson, R. M. (2019). Design and construction of high-rise modular buildings based on recent projects. Proceedings of the institution of civil engineers-civil engineering.

10.1680/jcien.18.00058
10

Jiang, Y. S., Li, M. X., Ma, B. J., Zhong, R. Y., & Huang, G. Q. (2024). Data-driven out-of-order model for synchronized planning, scheduling, and execution in modular construction fit-out management. Computer-Aided Civil and Infrastructure Engineering, 39(16), 2457-2480. https://doi.org/10.1111/mice.13203

10.1111/mice.13203
11

Kamali, M., & Hewage, K. (2016). Life cycle performance of modular buildings: A critical review. Renewable and Sustainable Energy Reviews, 62, 1171-1183.

10.1016/j.rser.2016.05.031
12

Kang, H., Kim, J. & Kim, Y. (2018). Risk assessment and contingency prediction considering work characteristics for modular plant construction projects. Korean Journal of Construction Engineering and Management, 19, 81-89.

13

Khalfan, M. M. A., & Maqsood, T. (2014). Current state of off-site manufacturing in australian and chinese residential construction. Journal of Construction Engineering, 2014(1), 164863. https://doi.org/10.1155/2014/164863

10.1155/2014/164863
14

Khan, A. A., Yu, R., Gu, N., Liu, T., Walsh, J., Sepasgozar, S., & Crough, D. (2023). Exploring critical risk factors in volumetric modular construction: fault tree analysis with stakeholders' perspectives on probability and impact. Journal of Architectural Engineering, 29(4), 04023037.

10.1061/JAEIED.AEENG-1608
15

Kosbar, M. M., Elbeltagi, E., Mahdi, I., Kassem, M., & Ehab, A. (2023). Off-site manufacturing: determining decision-making factors. Buildings, 13(11), 2856. https://www.mdpi.com/2075-5309/13/11/2856

10.3390/buildings13112856
16

Liu, G., Li, K., Zhao, D. & Mao, C. (2017). Business model innovation and its drivers in the Chinese construction industry during the shift to modular prefabrication. Journal of Management in Engineering, 33, 04016051.

10.1061/(ASCE)ME.1943-5479.0000501
17

Mawra, K., Rashid, K., Alqahtani, F. K., Zafar, I., Jeong, J. G., & Ju, M. (2024). Sustainability assessment integrating BIM and decision-making for modular slab construction against conventional cast-in-situ. Engineering Science and Technology-an International Journal-Jestech, 60, Article 101891. https://doi.org/10.1016/j.jestch.2024.101891

10.1016/j.jestch.2024.101891
18

Murtaza, M. B., Fisher, D. J., & Skibniewski, M. J. (1993). Knowledge-based approach to modular construction decision support. Journal of Construction Engineering and Management, 119, 115-130.

10.1061/(ASCE)0733-9364(1993)119:1(115)
19

Noordzy, G., & Whitfield, R. (2021). The new hotel development project life cycle-doing the right new hotel project holistically, and doing it the right way. The Journal of Modern Project Management, 8(3).

20

Pan, W., & Goodier, C. (2012). House-building business models and off-site construction take-up. Journal of Architectural Engineering, 18(2), 84-93.

10.1061/(ASCE)AE.1943-5568.0000058
21

Pan, W., & Hon, C. K. (2020). Briefing: Modular integrated construction for high-rise buildings. Proceedings of the Institution of Civil Engineers-Municipal Engineer, 173(2) 64-68.

10.1680/jmuen.18.00028
22

Pan, W., Gibb, A. G., & Dainty, A. R. (2007). Perspectives of UK housebuilders on the use of offsite modern methods of construction. Construction Management and Economics, 25, 183-194.

10.1080/01446190600827058
23

Park, C. Y., Kim, H., Won, J. W., Jang, W., & Han, S. H. (2016). A study for selecting modular construction method - focus on benefits and barriers of modular method. Korean Journal of Construction Engineering and Management, 17, 12-19.

10.6106/KJCEM.2016.17.4.012
24

Rangasamy, V., & Yang, J. B. (2024). The convergence of BIM, AI and IoT: Reshaping the future of prefabricated construction. Journal of Building Engineering, 84, Article 108606. https://doi.org/10.1016/j.jobe.2024.108606

10.1016/j.jobe.2024.108606
25

Saad, A. M., Zulu, S. L., & Dulaimi, M. (2024). "It's your fault!" - said a public client to modernity advocates: an exploration of UK public sector's viewpoints on the modern methods of construction. Construction Innovation-England, 24(6), 1483-1504. https://doi.org/10.1108/ci-11-2022-0282

10.1108/CI-11-2022-0282
26

Shin, H. K., Ham, H. R., Jang, H. J., & Ahn, Y. H. (2019). Economic feasibility study on the modular apartment housing according to the life cycle costing methodology - A case study on the modular apartment housing in cheonan. Journal of Korea Facility Management Association, 14(1), 15-24

27

Shin, H., Kim, S. & Ahn, Y. 2017. Decision model of construction errors management based on modular method construction process. Korean Journal of Construction Engineering and Management, 18, 98-108.

28

Tam, V. W., Tam, C. M., Zeng, S., & Ng, W. C. (2007). Towards adoption of prefabrication in construction. Building and Environment, 42(10), 3642-3654.

10.1016/j.buildenv.2006.10.003
29

Wong, P. S., Zwar, C., & Gharaie, E. 2017. Examining the drivers and states of organizational change for greater use of prefabrication in construction projects. Journal of Construction Engineering and Management, 143, 04017020.

10.1061/(ASCE)CO.1943-7862.0001309
Information
  • Publisher :The Korean Society of Living Environmental System
  • Publisher(Ko) :한국생활환경학회
  • Journal Title :Journal of The Korean Society of Living Environmental System
  • Journal Title(Ko) :한국생활환경학회
  • Volume : 32
  • No :2
  • Pages :168-178
  • Received Date : 2025-02-26
  • Revised Date : 2025-03-30
  • Accepted Date : 2025-04-07